Finishing touches

Thursday, June 5, 2014

Blake Hickman, with Hickman Construction, touches up a rail and Alan Hopper with Hopper Roofing drills into the roof as Eddie Hickman takes a final tour around the caboose at the Sikeston Depot Museum. The caboose, which was completely rebuilt, was declared completed Wednesday afternoon. "Thanks to local contractors Hickman Construction and Hopper Roofing the red caboose, a Sikeston icon, is restored to as good as new," declared Shari Bartyzel, Depot director.

To Read More
Subscribe Sign In
Continue reading with a subscription
Subscription options